NAC408.413. Control of traffic.  


Latest version.
  •      1. Adequate warning signs and devices to control traffic must be installed along the highway and in the areas where construction or maintenance of the encroachment is performed in accordance with the Manual on Uniform Traffic Control Devices, adopted by reference pursuant to subsection 1 of NAC 408.411.

         2. If the flow of traffic will be disrupted or other conditions at the site require, the utility shall submit a written plan for controlling traffic to the Department for approval by the district engineer before any work may begin upon the right-of-way of the highway.

     (Added to NAC by Dep’t of Transportation, eff. 1-6-95; A by R135-98, 10-3-2000)