NAC444.6663. Transfer stations: Requirements for operating plan.  


Latest version.
  • The operating plan of the transfer station required pursuant to NAC 444.6661 must include, without limitation:

         1. Provisions for the control of access to the transfer station;

         2. The number of attendants who will be at the transfer station during operating hours;

         3. A list of the equipment and machinery that will be used at the transfer station;

         4. Procedures for controlling vehicular traffic;

         5. The types of wastes that the transfer station will not receive and a list of the facilities where such waste will be directed;

         6. A program for detecting and preventing the disposal of regulated hazardous waste and polychlorinated biphenyl wastes;

         7. Procedures for measuring or weighing incoming solid waste;

         8. The proposed capacity and expected life of the transfer station;

         9. The frequency and method of transfer of solid waste to a disposal site;

         10. The maximum time that solid waste will be stored at the transfer station;

         11. The location of waste storage areas at the transfer station;

         12. The proposed operating hours;

         13. A contingency plan that describes procedures for emergencies and alternate solid waste handling systems;

         14. A plan approved by the local fire authority for the prevention and control of fires;

         15. A plan for the management of special wastes that are proposed for acceptance at the facility; and

         16. A description of how the transfer station will comply with the operating standards set forth in NAC 444.66645.

     (Added to NAC by Environmental Comm’n by R034-98, eff. 4-17-98)