Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter445A Water Controls |
WATER POLLUTION CONTROL |
Action Levels for Contaminated Sites |
NAC445A.2271. Contamination of soil: Plan and schedule for completing corrective action.
Latest version.
- An owner or operator who is required to take corrective action pursuant to NAC 445A.227 shall submit to the Division a plan and schedule for completing the corrective action. Except as otherwise provided in NAC 445A.22695, the owner or operator shall not take any corrective action until the plan and schedule are approved by the Division.
(Added to NAC by Environmental Comm’n, eff. 10-3-96; A by R189-08, 8-25-2009)