- The proposed operating plans for a facility must include:
1. A description of the mineral processing circuit which includes a flow chart of the facility and the range of operating conditions for which the process components were designed.
2. A plan for the management of process fluids which describes the methods to be used for the monitoring and controlling of all process fluids. The plan must provide a description of the means to evaluate the conditions in the fluid management system so as to be able to quantify the available storage capacity for meteoric waters and to define when and to what extent the designed containment capacity has been exceeded.
3. A plan for monitoring the facility which describes:
(a) The water quality in the area;
(b) The monitoring locations the applicant proposes to sample routinely in order to evaluate surface and groundwater at the site that may be affected by the operation of the facility;
(c) An analytical profile of each surface and groundwater that may be affected by the operation of the facility; and
(d) The locations of the leak detection systems, the frequency for sampling these systems and the analytical profile to be used for evaluation of the samples.
4. A plan for responding to emergencies which:
(a) Describes what actions must be initiated and by whom as a result of various possible failures in the fluid management system which would result in releases of pollutants; and
(b) Is designed to minimize the environmental impact resulting from the release of process fluids.
5. A temporary closure plan resulting from conditions described in subsection 1 of NAC 445A.444 which describes the activities which must be maintained during the time of closure.
6. A tentative plan for the permanent closure of the facility which describes the procedures, methods and schedule for stabilizing spent process materials. The plan must include:
(a) Procedures for characterizing spent process materials as they are generated; and
(b) The procedures to stabilize all process components with an emphasis on stabilizing spent process materials and the estimated cost for the procedures.
(Added to NAC by Environmental Comm’n, eff. 9-1-89)—(Substituted in revision for NAC 445.24296)