NAC701B.180. Solar energy systems: Requirements for eligibility.  


Latest version.
  • For all Solar Program categories:

         1. A solar energy system must be located on the premises within the Nevada service territory of a participating utility.

         2. A solar energy system with a capacity of not more than 25 kilowatts must have:

         (a) A 2-year workmanship warranty for the installation of the solar energy system, including labor and materials;

         (b) A 7-year product warranty for the inverters, limited to material; and

         (c) A 20-year product or production warranty for the solar panels, limited to material.

         3. A solar energy system must be installed:

         (a) By an installer who has been issued a classification C-2 license with the appropriate subclassification by the State Contractors’ Board pursuant to the regulations adopted by the Board; and

         (b) In conformance with the manufacturers’ specifications and with all applicable electrical and building codes and standards.

     (Added to NAC by Pub. Utilities Comm’n by R175-07, eff. 4-17-2008; A by R184-09, 4-20-2010; R122-13, 2-26-2014)