NAC338.640. Procedure after opening proposals.


Latest version.
  •      1. The list compiled and provided to a public body or its authorized representative by a construction manager at risk pursuant to subsection 8 of NRS 338.16995 must contain:

         (a) The name, contact information, and the trade or scope of work, or, if applicable, both the trade and scope of work, of the subcontractor; and

         (b) The price of the proposal submitted by the subcontractor.

    Ê The list must be made available to the public upon request but the results of the bidding may only be made available to the public after the selection and approval of the best bid for each trade and scope of work.

         2. The construction manager at risk must provide to the public body or its authorized representative a copy of all proposals submitted by the subcontractors, and the public body must maintain a copy of each proposal in the project file for the public work.

         3. A construction manager at risk shall evaluate the proposals and select a subcontractor in accordance with the provisions of subsection 9 of NRS 338.16995. The construction manager at risk must record, document and preserve the evaluations of the proposals.

         4. If requested, the construction manager at risk must meet with a subcontractor who was not selected to discuss the reasons that the subcontractor was not selected.

         5. A public body or its authorized representative must confirm that the construction manager at risk has complied with the requirements of NRS 338.16995 and NAC 338.550 to 338.640, inclusive.

     (Added to NAC by Pub. Works Bd. by R099-11, eff. 5-30-2012)