NAC349.410. Ensuring proper operation and maintenance of project.  


Latest version.
  • Reports may be required by the Board or a person designated by the Board to ensure that a project is being properly operated and maintained during the payout period of the loan. Findings will be presented to the Board at a regular meeting of the Board.

     (Added to NAC by Dep’t of Commerce, eff. 4-22-88)