NAC378.060. Evaluation of proposal.
- The State Library and Archives Administrator will evaluate each proposal to determine if the:
1. Proposed project corresponds to the needs of the community.
2. Proposed project conforms to the local master plan for the library and the statewide master plan.
3. Proposed facility is designed for ease of access and use by the public.
4. Applicant demonstrates that there is local support sufficient to maintain the programs for which the facility is intended.
5. Proposal includes using an experienced librarian to develop a program for construction of the project and to communicate with the architects and contractors throughout the period of construction.
6. Project will conform to all applicable local and state requirements for construction.
7. Cost per square foot corresponds to standard costs in that area for similar buildings.
(Added to NAC by St. Librarian, eff. 12-30-85)