NAC408.4392. Underground installation required; exception.  


Latest version.
  • A telecommunications facility must be installed underground on a state highway or right-of-way unless the Department determines that an overhead installation is appropriate. In determining whether to authorize an overhead installation, the Department will consider public health and safety and the factors set forth in NAC 408.467.

     (Added to NAC by Dep’t of Transportation by R082-01, eff. 11-1-2001)