Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter439A Planning for the Provision of Health Care |
APPROVAL OF PROJECTS |
Requirements Regarding Proposed Projects |
NAC439A.338. Capital expenditures for which approval not required; determination of cost of new construction subject to letter of approval.
-
1. The provisions of subsection 1 of NRS 439A.100 are applicable only to a project which is not dependent on or related to a larger single project.
2. The cost for construction in which no new square footage is added is not subject to a letter of approval. The cost of construction related to the existing space must be deducted from the total capital expenditure to determine the cost of the new construction subject to a letter of approval.
3. The cost of construction attributed to space for a medical office building or an office for a health practitioner to be used solely to provide routine health services as defined in NRS 439A.017 must be deducted from the total capital expenditures to determine the cost of new construction subject to a letter of approval.
(Added to NAC by Dep’t of Human Resources, eff. 11-10-87; A 1-2-90; 10-14-97)