NAC444.6896. Plan for postclosure; use of property during or after period of postclosure.  


Latest version.
  •      1. A plan for postclosure which specifies how and at what frequency a municipal solid waste landfill unit will be maintained and monitored during the period of postclosure must include:

         (a) A program for monitoring water which complies with the requirements of NAC 444.7481 to 444.7499, inclusive;

         (b) A program for the inspection and maintenance of:

              (1) The final cover;

              (2) Structures for drainage and protection from floods; and

              (3) Systems for monitoring and controlling landfill gases;

         (c) The name, address and telephone number of the person or office to contact about the unit during the period of postclosure;

         (d) A description of the planned uses of the property during the period of postclosure; and

         (e) Any other information which the solid waste management authority may require.

         2. Any use of the property during or after the period of postclosure must not disturb the integrity of the final cover, liners, any other components of the system for containment or the function of the monitoring system unless necessary to comply with the requirements of NAC 444.570 to 444.7499, inclusive.

     (Added to NAC by Environmental Comm’n, eff. 11-8-93; A 3-1-94)