NAC444.8381. Stepped network of trenches utilizing relief lines: Inspections.  


Latest version.
  •      1. An engineer shall:

         (a) Inspect each trench of a stepped network of trenches utilizing relief lines before the trench is covered; and

         (b) Verify that the elevation of each disposal line and invert for overflow conforms with the approved plans.

         2. The engineer shall, within 30 days after the date on which the construction of the system is completed, submit a letter to the health authority stating that the system was constructed in accordance with the approved plans.

     (Added to NAC by Bd. of Health by R129-98, eff. 3-25-99)