NAC445A.283. Permit required to construct, install, expand or modify treatment works.  


Latest version.
  • No person without first obtaining a permit from the Department may:

         1. Construct, install, expand or significantly modify any factory, mill, plant or other industrial or commercial facility which will result in a discharge not authorized by an existing permit to waters of the State.

         2. Add extensions to existing municipal or privately owned sewer systems or provide new sewer service to existing or newly constructed buildings which could cause the raw sewage influent to the treatment plant to exceed the limits prescribed by the permit issued in accordance with NAC 445A.228 to 445A.263, inclusive.

         3. Construct, install or significantly modify any facilities designed or used for treatment or discharge of pollutants.

     [Environmental Comm’n, Water Pollution Control Reg. §§ 3.1.1-3.1.3, eff. 5-2-78]—(Substituted in revision for NAC 445.179)