  • An application for a permit to construct, operate and close permanently a pilot facility or testing facility must include:

         1. The information required in paragraphs (a) to (d), inclusive, of subsection 2 of NAC 445A.394;

         2. The quantity of the material to be evaluated;

         3. The time required to complete all testing;

         4. The type and quantity of chemicals to be utilized in the testing process;

         5. A copy of the plans for the system and individual process components;

         6. A description of the monitoring systems which are to be used to satisfy the requirements of NAC 445A.424;

         7. A description of the procedures to be used to stabilize and dispose of the spent ore;

         8. A topographic map of the area for the test site;

         9. A description of hydrogeologic conditions at the site; and

         10. A draft plan for the permanent closure of the facility, including a plan to stabilize areas disturbed by the operations of the facility.

     (Added to NAC by Environmental Comm’n, eff. 9-1-89)—(Substituted in revision for NAC 445.24324)