NAC445A.54046. Requirements for plan of operations.  


Latest version.
  •      1. A public water system shall submit a plan of operations for each facility that treats groundwater to the Division or the appropriate district board of health for review and approval. The plan must be designed to produce the optimal quality of water from the treatment process. The supplier shall operate the facility in accordance with the approved plan.

         2. The plan must include a description of:

         (a) The program for monitoring the performance of the treatment facility;

         (b) The program for maintaining unit process equipment;

         (c) The persons who operate the facility, including the number of staff and the level of their training;

         (d) The operation of each unit process;

         (e) The procedures used in the laboratory, if applicable;

         (f) The procedures used to determine chemical dose rates;

         (g) Recordkeeping protocol;

         (h) The procedure for responding to an emergency at the facility or within the watershed that could conceivably affect the treatment facility; and

         (i) Any other features that contribute to the reliable operation of the facility.

     (Added to NAC by Environmental Comm’n by R126-05, eff. 10-31-2005)