NAC445A.6673. Existing systems: Evaluation, justification and design of proposed water project.  


Latest version.
  • If an existing public water system proposes to perform a water project after February 20, 1997, the proposed water project must be:

         1. Evaluated and justified by an engineer through technical means; and

         2. Designed on the basis of historical data or other representative data that complies with accepted engineering judgment and practice, in such a manner that the proposed water project will enable the public water system to meet average day demand, maximum day demand, peak hour demand and requirements for fire flow and fire demand.

     (Added to NAC by Bd. of Health, eff. 2-20-97)