NAC445A.66885. Water wells: Prerequisites to use after construction, modification or reconditioning.  


Latest version.
  •      1. After the construction of a water well is completed and before any water from the well is allowed to enter a public water system, the supplier of water shall:

         (a) Submit to the Division or the appropriate district board of health a copy of a chemical analysis conducted by a properly certified laboratory which indicates that the water complies with the provisions of NAC 445A.450 to 445A.492, inclusive; and

         (b) If the supplier of water proposes to blend, dilute or otherwise treat the water to attain compliance with any of those provisions:

              (1) Submit to the Division or the appropriate district board of health a complete description of the proposal, as prepared by an engineer; and

              (2) Obtain the approval of the proposal by the Division or the appropriate district board of health.

         2. After the construction of any modification or reconditioning of a water well is completed and before the well is placed into service:

         (a) The well and any associated pumping equipment must be disinfected in compliance with American Water Works Association Standard C654, as adopted by reference in NAC 445A.6663; and

         (b) A satisfactory bacteriological analysis of a sample of the water from the well must be submitted to the Division or the appropriate district board of health.

     (Added to NAC by Bd. of Health, eff. 2-20-97; A by Environmental Comm’n by R194-08, 10-27-2009)