NAC445A.67641. Submission to Division of set of as-built drawings of water project.  


Latest version.
  • No later than 90 days after the completion of a water project, the recipient shall supply the Division with one set of drawings of the water project as it was built.

     (Added to NAC by Bd. of Health by R067-98, eff. 7-23-98)