NAC445A.913. Frequency of monitoring.
Latest version.
- The pressure of injection, pressure of the annular space between the tubing and the casing, rate of flow and cumulative volume of injected fluid must be monitored at least:
1. Once each week for the disposal operations of a Class II well.
2. Twice each month for Class III wells.
3. Once each month for enhanced recovery of a Class II well.
4. Once each day for injection of liquid hydrocarbons and the injection for withdrawal of stored hydrocarbons for a Class II well.
5. As required by the permit for the operation of a Class V well.
(Added to NAC by Environmental Comm’n, eff. 7-22-87; A 10-21-87)—(Substituted in revision for NAC 445.4272)