NAC445B.124. “Operating permit to construct” defined.  


Latest version.
  • “Operating permit to construct” means an operating permit signed and issued by the Director which:

         1. Authorizes the construction and an initial period of operation of a proposed new Class I stationary source or modification to an existing Class I stationary source;

         2. Includes the conditions which apply to the construction and the initial period of operation of the Class I stationary source or modification to an existing Class I stationary source; and

         3. Includes the requirement that the holder of the operating permit to construct submit a complete application for a Class I operating permit or for a modification of an existing Class I operating permit within 12 months after the date of the initial start-up of the new or modified Class I stationary source.

     (Added to NAC by Environmental Comm’n by R103-02, eff. 12-17-2002)