NAC445B.298. Application: Official date of submittal.  


Latest version.
  • Except as otherwise provided in NAC 445B.3364, 445B.3395, 445B.3457, 445B.3487, 445B.3524 or 445B.3683, the official date of submittal of an application for:

         1. An operating permit;

         2. An operating permit to construct;

         3. A revision of an existing operating permit; or

         4. A revision of an existing operating permit to construct,

    Ê is the date on which the Director determines that the application is complete.

     [Environmental Comm’n, Air Quality Reg. §§ 3.1.4 & 3.1.7, eff. 11-7-75]—(NAC A 10-22-87; 9-19-90; 12-13-93; R105-97, 3-5-98; R198-03, 4-26-2004; R125-04, 9-24-2004; R162-06, 9-18-2006; R040-10, 7-22-2010; R014-11, 10-26-2011)