NAC449.5225. Safety and comfort of patients during construction; imposition of more stringent design and space requirements.  


Latest version.
  •      1. If any construction occurs in or near an area of the facility that is occupied by a patient of the facility, the facility shall ensure the safety and comfort of the patient during the construction.

         2. A facility may impose more stringent design and space requirements than the requirements set forth in NAC 449.501 to 449.5795, inclusive.

     (Added to NAC by Bd. of Health by R130-99, eff. 8-1-2001)