NAC455C.210. Connective pipes.  


Latest version.
  • All connective pipes that are subjected to pressure emanating from:

         1. A heating boiler;

         2. A hot water supply boiler;

         3. A fired storage water heater;

         4. A power or process boiler; or

         5. An unfired pressure vessel,

    Ê are part of the installation of the boiler or pressure vessel and must comply with the requirements for the boiler or pressure vessel. The inspection of the initial installation of such pipes must be performed by an inspector.

     (Added to NAC by Div. of Industrial Relations by R101-02, eff. 12-15-2004)