NAC461.110. Action by Administrator on application for approval.  


Latest version.
  •      1. The Administrator will, in a timely manner, examine an application, plans and other data filed by an applicant.

         2. If the application is for the initial approval of a system of construction for factory-built housing, manufactured buildings or modular components, the Administrator will perform a quality control audit review of the manufacturing site.

         3. If the application is for the approval of plans for a model of factory-built housing, a manufactured building or a modular component that are not reviewed by a third-party reviewer, the Administrator will review the plans as set forth in NAC 461.117.

         4. If the Administrator finds:

         (a) That the work described in an application and plans essentially conforms to the requirements of the technical codes and this chapter; and

         (b) If the application is for approval of a system of construction, that the system passes the review or can pass the review if the system is corrected,

    Ê the Administrator will note on the plans or a separate sheet of paper any corrections required and will endorse or stamp the plans as “APPROVED.”

         5. If the application is filed by the manufacturer, the Administrator will return one set of the approved documents to the applicant for use at the manufacturing site.

     [Mfd. Housing Div., Factory-built Housing Reg. § 11, eff. 8-6-82]—(NAC A by R192-05, 9-18-2006)