Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter512 Inspection and Safety of Mines |
BOILERS AND PRESSURE VESSELS |
Installation and Safety Requirements |
NAC512.581. Clearance: Fired storage and fired coil water heater.
Latest version.
- The clearance between a wall or other structure and a fired storage and fired coil water heater must be at least that specified by the manufacturer.
(Added to NAC by Div. of Industrial Relations by R141-98, eff. 1-28-2000)