NAC519A.340. Authority of Division to request operator of exploration project to perform certain types of reclamation.  


Latest version.
  • The Division may, if appropriate, request an operator of an exploration project to reclaim:

         1. Roads and drill pads by:

         (a) Recontouring or regrading to round off, cut and fill slopes;

         (b) Removing culverts;

         (c) Ripping or scarifying the surface;

         (d) Constructing water bars;

         (e) Revegetation; and

         (f) Restoring or stabilizing drainage areas and streambeds.

         2. Drill holes from exploration by plugging the holes with the minimum surface plug required pursuant to chapter 534 of NRS.

         3. Trenches and pits by:

         (a) Backfilling and regrading to approximate the form of the land before it was disturbed;

         (b) Regrading to make the land stable; and

         (c) Revegetation.

     (Added to NAC by Environmental Comm’n, eff. 9-19-90; A 9-5-91)