  •      1. Adequate facilities must be provided for efficient measurement of the gas and oil produced for the purpose of obtaining gas to oil ratios on each well and reporting oil, gas and water production.

         2. Wellhead equipment must be installed and maintained in good working condition so that static bottom hole pressures of flowing wells may be obtained at any time.

         3. Valves must be installed on both casing and tubing so that surface pressures can be readily measured at any time.