Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter534A Geothermal Resources |
REGULATIONS OF COMMISSION ON MINERAL RESOURCES |
Permits, Fees and Other Requirements for Drilling |
NAC534A.360. Filing of directional survey after completion of directionally drilled well.
Latest version.
- Within 60 days after the completion of a directionally drilled well, a directional survey of the well, including a plat obtained by the method used to survey wells, must be filed with the Division.
(Added to NAC by Comm’n on Mineral Resources, eff. 11-12-85)