NAC534A.550. Filing of report of completion and well logs.  


Latest version.
  •      1. Within 30 days after the completion of the construction of a well, the owner of the geothermal resource or the operator shall file with the Division:

         (a) A report setting forth the manner in which the well was completed.

         (b) Two sets of all well logs.

         2. The Division shall file one set of the well logs with the Bureau of Mines and Geology of the State of Nevada.

     (Added to NAC by Comm’n on Mineral Resources, eff. 11-12-85; A 12-16-92)