Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter535 Dams and Other Obstructions |
CONSTRUCTION, RECONSTRUCTION, ALTERATION AND DECOMMISSIONING OF DAMS |
NAC535.350. Assessment of fee for approved storage.
-
1. Except as otherwise provided in subsection 4, the State Engineer will, not later than December 31 of each year, assess each private, nonagricultural dam that is operated pursuant to an approval to impound, including a temporary approval to impound, the fee for approved storage required by NRS 533.435.
2. The State Engineer will use the approved capacity stated in the approval to impound, including a temporary approval to impound, in effect as of December 31 of the fiscal year of the assessment as the approved storage capacity subject to the fee.
3. The fee is due and payable upon receipt.
4. This section does not apply to a storm water detention dam so long as the dam:
(a) Has an unregulated outlet; and
(b) Is free-draining.
(Added to NAC by St. Engineer by R124-02, eff. 5-30-2003)