NAC538.380. “Schedule B” defined.
Latest version.
- “Schedule B” means the schedule appearing at 43 U.S.C. § 619a (a)(l)(B) which specifies the amount of:
1. Contingent capacity of the Hoover power plant resulting from the program for increasing capacity; and
2. Associated firm energy, allocated to the Commission.
(Added to NAC by Colorado River Comm’n, eff. 9-13-85)