Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter538 Colorado River Commission of Nevada |
MARKETING OF ELECTRIC POWER |
Terms and Conditions Not Subject to Change |
NAC538.560. Reduction of allocation of power to contractor.
Latest version.
- Except as otherwise provided in this section, if, for 3 consecutive operating years, a retail customer does not use the full allocation of power made available to it by the Commission, the Commission, after notifying the contractor, may reduce its allocation to that contractor to the extent of the contractor’s failure to use that full allocation. A reduction will not be made if the contractor’s failure to use that full allocation is caused by the implementation of a program for integrated resource planning or a similar program, however designated, described in NAC 538.530 and approved for the contractor by Western or the Commission.
(Added to NAC by Colorado River Comm’n, eff. 9-13-85; A 11-24-87; R123-00, 2-15-2001; R108-06, 6-28-2006)