NAC538.610. Rates, charges and costs.  


Latest version.
  •      1. The rates or charges payable by a contractor to the Commission for capacity or energy from the Boulder Canyon Project, Parker-Davis Project or Salt Lake City Area Integrated Projects and for wheeling energy from the Parker-Davis Project or Salt Lake City Area Integrated Projects must be Western’s effective rates or charges for those resources. These rates or charges, the Commission’s administrative charge and any other costs associated with the contracted resource will be shown by a periodic report or by exhibits to the contracts for power from these projects. These rates, charges and costs may vary due to changing conditions. Some rates or charges may be estimated for a portion of an operating year with an adjustment, for the months the estimate is used, in the month the actual rate or charge is established.

         2. At the time the Commission is notified by Western of any change in the rates or charges, the Commission will notify its contractors of the change.

         3. The administrative charge is based on a projection for 2 years of all costs for the Commission’s operations relating to the contractors. Those estimated costs are divided by the total estimated number of kilowatt-hours of all energy, including both hydroelectric and nonhydroelectric, to be delivered to contractors to arrive at a rate per kilowatt-hour. The administrative charge may be increased or decreased after the Commission notifies the contractors of the grounds for the increase or decrease.

     (Added to NAC by Colorado River Comm’n, eff. 9-13-85; A by R123-00, 2-15-2001)