NAC538.670. Points of receipt; charge for transmission.
Latest version.
-
1. The contractor shall, in its application, designate the point or points of receipt required to service its load and any facilities for transmission from point of receipt to the point or points for metering the load.
2. The contractor is financially responsible for acquiring any rights of transmission between its designated point of receipt and its points for metering the load.
3. A charge for transmission may be imposed on deliveries of power from the Boulder Canyon Project, Parker-Davis Project or Salt Lake City Area Integrated Projects to the contractor’s designated points of receipt.
(Added to NAC by Colorado River Comm’n, eff. 9-13-85; A 12-17-87; R123-00, 2-15-2001)