Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter538 Colorado River Commission of Nevada |
MARKETING OF ELECTRIC POWER |
Allocation of Marketable Long-Term Capacity and Energy |
NAC538.730. Pool 3: Applicable resource; allocation.
- Pool 3 consists of power from the Salt Lake City Area Integrated Projects, at Pinnacle Peak, in the amounts of 20,851 kilowatts of capacity and 46,054,700 kilowatt-hours of energy in the summer season and 27,414 kilowatts of capacity and 61,011,134 kilowatt-hours of energy in the winter season. This resource is reserved for allocation to the named entities as follows:
Salt Lake City Area Integrated Projects
Capacity and Energy
Summer Season
Winter Season
Contractor1
Capacity(KW)
Energy(KWH)
Capacity(KW)
Energy(KWH)
Ampac
2,756
6,086,817
3,623
8,063,533
BC
5,537
12,228,710
7,279
16,200,029
OPD
6,279
13,869,586
8,256
18,373,786
VEA
6,279
13,869,587
8,256
18,373,786
Totals
20,851
46,054,700
27,414
61,011,134
1Key: Ampac = American Pacific Corporation
BC = Boulder City
OPD = Overton Power District No. 5
VEA = Valley Electric Association
(Added to NAC by Colorado River Comm’n, eff. 12-17-87; A 2-18-88; R123-00, 2-15-2001; R108-06, 6-28-2006)