NAC538.770. Access to adequate facility for transportation of water.  


Latest version.
  •      1. The applicant must have access or demonstrate that it will be able to obtain access to a facility which is adequate to transport the water requested from the proposed point of diversion to the proposed place of use.

         2. If the facility has not been constructed or is not in operation when the application is submitted to the Commission, the applicant must demonstrate:

         (a) Its ability to finance the construction of the facility; and

         (b) That the facility will be constructed and in operation at such time as to ensure the applicant’s present or future demand for the water.

     (Added to NAC by Colorado River Comm’n, eff. 8-12-91)