NAC576.330. Application for certificate: Submission; contents.  


Latest version.
  •      1. To obtain a certified producer’s certificate, a person must submit to the Department, on a form prescribed by the Department, a separate application for each plot of land on which an agricultural product of the soil will be grown. For the purposes of this section, a separate application is required for each plot of land on which an agricultural product of the soil will be grown if the plot of land is not contiguous to any other plot of land on which an agricultural product of the soil will be grown.

         2. The application must include, without limitation:

         (a) The name, mailing address and telephone number of the applicant;

         (b) The physical address of the plot of land on which each agricultural product of the soil will be grown;

         (c) A list of each agricultural product of the soil for which the applicant seeks certification and anticipates that he will grow and offer for sale during the 12 months for which the certificate is valid;

         (d) The estimated yield of each agricultural product of the soil listed on the application;

         (e) The harvest season of each agricultural product of the soil listed on the application;

         (f) If an agricultural product of the soil is to be stored, the length of time the product will be stored;

         (g) If any agricultural product of the soil produced by the applicant is in storage at the time of application, the physical address at which the product is being stored and the amount of the product that is being stored at that location at the time of application;

         (h) The total area of the plot of land which is under cultivation for each agricultural product of the soil listed on the application, designated in terms of acres or square feet, as applicable;

         (i) A detailed map that indicates the location of the plot of land on which any agricultural product of the soil listed pursuant to paragraph (c) will be grown; and

         (j) The fee set forth in NAC 576.371 for the application and the inspection required pursuant to NAC 576.340.

         3. Except as otherwise provided in this subsection, an application must be submitted to the Department at least 30 days before the harvest of an agricultural product of the soil that is listed on the application. The Department may, in its discretion, waive the requirements set forth in this subsection.

     (Added to NAC by Div. of Agriculture by R097-98, eff. 12-14-98; A by Dep’t of Agriculture by R125-05, 10-31-2005)