NAC587.256. Conditioners: Responsibilities; duration of approval.


Latest version.
  •      1. Conditioners requiring certification services must apply to the Department.

         2. To condition seed eligible for certification, a conditioner must meet the following requirements:

         (a) Facilities must be available to perform the conditioning without introducing admixtures;

         (b) Identity of the seed must be maintained at all times;

         (c) Records of all operations relating to certification must be complete and adequate to account for all incoming seed and final disposition of seed;

         (d) Conditioners must permit inspection by the Department of all records of the kind of seed certified, including both certified and noncertified seed; and

         (e) Conditioners must designate a person who will be responsible to the Department for performing such duties as are required.

         3. Approval of conditioners is on an annual basis.

     (Added to NAC by Dep’t of Agriculture, eff. 6-11-80; A 12-3-90; R174-99, 3-13-2000)