NAC625.760. Contract drawings and specifications; special instructions.  


Latest version.
  • Before beginning a construction survey, a professional land surveyor shall obtain from the owner’s representative a complete set of the contract drawings and specifications approved by the appropriate federal, state and local agencies and any special instructions for the proposed fixed works.

     (Added to NAC by Bd. of Professional Eng’rs & Land Surv., eff. 11-14-97)