Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter625 Professional Engineers and Land Surveyors |
STANDARDS OF PRACTICE FOR PROFESSIONAL LAND SURVEYORS |
Construction Surveys |
NAC625.770. Verification of location of certain points; notification of insufficient dimensions or details.
-
1. A professional land surveyor who is conducting a construction survey shall ensure that:
(a) The location of the control that delineates the horizontal location of the proposed fixed works; and
(b) The locations of the benchmark for the project and the vertical location of the proposed fixed works,
Ê are identical to the locations of those points as shown on the engineering plans for the project.
2. If the professional land surveyor discovers any material differences between the location of the control on the construction survey and the location of the control on the engineering plans for the project, he or she shall notify the owner’s representative of those differences.
3. If the dimensions or details of the engineering plans are not sufficient to establish the location of the proposed fixed works, the professional land surveyor shall notify the owner’s representative and the engineer or architect of record and request that the necessary additional information be provided.
(Added to NAC by Bd. of Professional Eng’rs & Land Surv., eff. 11-14-97)