Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter645D Inspectors of Structures |
STANDARDS OF PRACTICE |
Standards of Conduct |
NAC645D.450. Conduct of inspection, partial inspection or reinspection; preparation of inspection report.
-
1. Except as otherwise provided in this section, a certified inspector shall conduct each inspection and prepare a complete inspection report of each inspection in accordance with NAC 645D.460 to 645D.580, inclusive.
2. A certified inspector may exceed the requirements set forth in NAC 645D.460 to 645D.580, inclusive, when conducting an inspection.
3. A certified inspector may conduct a partial inspection or reinspection that does not satisfy all the requirements of NAC 645D.480 to 645D.580, inclusive, if:
(a) The partial inspection or reinspection satisfies all the relevant requirements of NAC 645D.460 to 645D.580, inclusive; and
(b) The inspection report:
(1) States that a partial inspection or reinspection has been performed;
(2) Describes the purpose of the partial inspection or reinspection; and
(3) Clearly identifies the matters included in the partial inspection or reinspection.
4. The provisions of NAC 645D.480 to 645D.580, inclusive, do not require a certified inspector to move or disturb any item, including, without limitation, insulation, personal items, panels, furniture, equipment, plants, soil, snow, ice or other debris, that obstructs his access to or visibility of any item listed in NAC 645D.480 to 645D.580, inclusive.
(Added to NAC by Real Estate Div. by R214-97, eff. 5-11-98; A by R177-01, 5-20-2002)