Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter701 Energy Policy |
ENERGY DEVELOPMENT PROJECTS |
NAC701.805. Required contents of notice of project; notice of substantial change in scope or design of project.
-
1. In addition to the information that is required to be included with a notice filed pursuant to NRS 701.610, the notice must include:
(a) The name, physical address, telephone number and, if applicable, the electronic mail address of the applicant;
(b) The name, physical address, telephone number and, if applicable, the electronic mail address of the company, and at least one officer of the company, on behalf of which the notice is filed;
(c) The name of the proposed energy development project;
(d) A description and preliminary map of the proposed energy development project;
(e) The infrastructure requirements of the proposed energy development project, including, without limitation, an estimate of the amount of power, fuel, communication lines, access roads, rail lines and water use that will be required to complete the project;
(f) An estimate of the design voltage of any power lines which are required for the proposed energy development project;
(g) An estimate of the net maximum generating capacity of the proposed energy development project upon completion;
(h) A proposed schedule of project activities which identifies the estimated dates during which each project activity will occur and the duration of each activity; and
(i) Any other information that is required by the Department of Wildlife.
2. An applicant shall provide notice of any substantial change in the scope or design of a proposed energy development project to the Department of Wildlife concurrently with any notice of such a change which is provided to the Federal Government, the Public Utilities Commission of Nevada or any county in this State.
(Added to NAC by Dep’t of Wildlife by R038-11, eff. 3-9-2012)