NAC704.945. Resource plan: Inclusion of certain tables and graphs.  


Latest version.
  •      1. A utility shall include in its resource plan a table of loads and resources for each supply plan analyzed. The table must include the following data for each year of the resource plan:

         (a) The capacity provided by each supply resource;

         (b) The total expected capacity of all resources;

         (c) The forecasted peak demand;

         (d) The estimated impact of new programs for energy efficiency and conservation;

         (e) The expected capacity and energy provided by renewable resources, categorized by type;

         (f) The required planning reserves;

         (g) The total capacity required;

         (h) The excess or deficiency of capacity without additional resources; and

         (i) The excess or deficiency of capacity with additional planned resources.

         2. A graph must be included for the preferred plan of the utility showing, over the 20-year planning period:

         (a) The total resources requirements;

         (b) The total demand without new programs for energy efficiency and conservation;

         (c) The total demand with new programs for energy efficiency and conservation;

         (d) The total capacity with additional planned resources; and

         (e) The total capacity without additional resources.

         3. A graph must be included for the preferred plan that shows, for each year of the 20-year planning period, the excess or required capacity both with and without the additional planned resources.

         4. A graph or table must be provided that shows the allocation of the capacity of the transmission system of the utility between bundled retail transmission customers, unbundled retail transmission customers and wholesale transmission customers.

     (Added to NAC by Pub. Service Comm’n, eff. 6-7-84; A 2-18-88; A by Pub. Utilities Comm’n by R004-04, 5-25-2004; R042-10, 7-22-2010)