NAC704A.230. Design of system.  


Latest version.
  •      1. The engineering and design for the underground system to be installed represents part of the cost to the utility for which an advance can be required under NAC 704A.240, and the engineering and design work involved is the utility’s responsibility. The utility may select the size, type and quality of all materials to be used, but any oversizing, in terms of the load or service requirements of the subdivision, may, upon the applicant’s written submittal of all pertinent information, be disallowed by the Commission as part of the cost for which an advance can be required under NAC 704A.240.

         2. All materials, equipment and supplies selected by the utility, and the installation thereof, must comply with the minimum construction standards set forth in the National Electric Safety Code.

     [Pub. Service Comm’n, Gen. Order 9 Rule D, eff. 11-1-69]