NAC 445A.54022. Applicability. |
NAC 445A.54024. Prerequisites to commencement of project. |
NAC 445A.54026. Submission and review of preliminary engineering report before construction or modification of facility. |
NAC 445A.54028. Application for approval of facility. |
NAC 445A.5403. Approval of project: Prerequisites; effective period; revocation. |
NAC 445A.54032. Preparation by engineer of plans, specifications and design reports for facility. |
NAC 445A.54034. Design of facility to be based upon pilot plant study; approval of treatment technology without pilot study. |
NAC 445A.54036. Requirements for design of new facility. |
NAC 445A.54038. Inclusion of features for reliability in design and construction of facility. |
NAC 445A.5404. Equipment of facility for disinfection. |
NAC 445A.54042. Standards for disinfection. |
NAC 445A.54044. Certification of persons operating facility. |
NAC 445A.54046. Requirements for plan of operations. |
NAC 445A.54048. Maintenance of records. |
NAC 445A.5405. Submission of sampling logs. |