NAC445A.4155. Conditions pursuant to which modification to design of facility with existing permit does not require new public notice; extension of term of existing permit disallowed.  


Latest version.
  •      1. A modification to the design of a facility for which a permit has been granted by the Department does not require a new public notice if:

         (a) The modification requires review by the Department pursuant to NAC 445A.350 to 445A.447, inclusive; and

         (b) The Commission determines that the modification is not a modification of such significance as to constitute a “minor modification” or a “major modification,” as those terms are described in NAC 445A.416 and 445A.417, respectively.

         2. Such a modification may not extend the term of the permit.

     (Added to NAC by Environmental Comm’n, eff. 10-29-97)