NAC 445A.390. Permit required; operation under existing permit. |
NAC 445A.391. Application for permit: Preliminary meeting with representative of Department. |
NAC 445A.392. Application for permit: Construction or modification of process component; abbreviated application. |
NAC 445A.393. Application for permit: Definition of site conditions, process materials, characteristics of waste and impacts. |
NAC 445A.394. Application for permit: Submission; contents. |
NAC 445A.395. Contents of application: Assessment of area of review. |
NAC 445A.396. Contents of application: Meteorological report; analysis of samples. |
NAC 445A.397. Contents of application: Engineering design report; specifications for fluid management system. |
NAC 445A.398. Contents of application: Proposed operating plans. |
NAC 445A.399. Preparation of plan for seasonal closure of process components. |
NAC 445A.400. Initial review of application and notification of applicant; failure to provide information; submission of incorrect information. |
NAC 445A.401. Action by Department upon application. |
NAC 445A.402. Notice of intent to issue permit or deny application. |
NAC 445A.403. Request for hearing on application; submission of comments on draft permit. |
NAC 445A.404. Scheduling of public hearing on application. |
NAC 445A.405. Notice of hearing: Publication; contents. |
NAC 445A.406. Submission of testimony at hearing. |
NAC 445A.407. Issuance of statement responding to comments on draft permit. |
NAC 445A.408. Action by Director of Department after period for public comment. |
NAC 445A.409. Issuance and maintenance of permit; maximum term and renewal of permit. |
NAC 445A.410. Permit for small-scale facility: Contents of application; limitation on holding; applicability of minimum design criteria. |
NAC 445A.411. Pilot facility or testing facility: Conditions for issuance of permit. |
NAC 445A.412. Pilot facility or testing facility: Contents of application for permit. |
NAC 445A.413. Pilot facility or testing facility: Construction of application indicating need to conduct testing beyond 2 years. |
NAC 445A.414. Permit for facility using physical separation methods. |
NAC 445A.415. Granting of permit which allows lower level of engineered containment than required by minimum design criteria. |
NAC 445A.4155. Conditions pursuant to which modification to design of facility with existing permit does not require new public notice; extension of term of existing permit disallowed. |
NAC 445A.416. Minor modification of existing permit; modification of operating plans. |
NAC 445A.417. Major modification of existing permit. |
NAC 445A.418. Fee for modification of permit. |
NAC 445A.419. Transfer of permit to new owner or operator. |
NAC 445A.420. Renewal of permit; operation of facility pending issuance of new permit. |