NAC445A.419. Transfer of permit to new owner or operator.
-
1. A permit may be transferred to a new owner or operator.
2. Before the ownership or operation of a facility may be transferred during the term of a permit, the holder of the permit must inform the new owner or operator in writing of the requirements of the current permit and the requirements of NAC 445A.350 to 445A.447, inclusive.
3. A copy of that written notice must be sent to the Department.
4. The new owner or operator must state in writing to the Department that he or she will comply with the existing operating plans or provide revised plans to the Department for review and approval.
5. Until notice is given by the Department that the permit has been transferred, the current operator or owner named on the permit is responsible for complying with NAC 445A.350 to 445A.447, inclusive.
(Added to NAC by Environmental Comm’n, eff. 9-1-89)—(Substituted in revision for NAC 445.24338)