Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter445A Water Controls |
MINING FACILITIES |
Permits for Facilities |
NAC445A.394. Application for permit: Submission; contents.
-
1. To obtain a permit to construct, operate and close permanently a facility, the owner or operator of the proposed facility or the designated agent of the owner or operator must submit to the Department a written application signed by the owner or, if the owner does not operate the facility, the operator of the facility or his or her designated agent. The application must be accompanied by the appropriate fee established pursuant to NAC 445A.232.
2. An application for a permit must contain:
(a) The name, location and mailing address of the:
(1) Facility.
(2) Owner.
(3) Operator.
(4) Authorized agent.
(b) The legal structure of the applicant, including, but not limited to, whether the applicant is a sole proprietorship, partnership or corporation.
(c) The name of the owner of the land or mining claim or claims on which the facility will be located.
(d) Documentation that notice of the proposed development has been provided to the local board of county commissioners.
(e) The rate at which the facility is anticipated to be chemically processing ore in tons of ore per year.
(f) An assessment of the area of review as required by NAC 445A.395.
(g) A meteorological report as required by NAC 445A.396.
(h) An engineering design report as required by NAC 445A.397.
(i) A copy of the draft operating plans for the facility as required by NAC 445A.398.
(j) A report of the sample analysis as required by NAC 445A.396.
3. New applications or requests for major modifications to existing permits must be submitted to the Department at least 165 days before the date on which the applicant wishes to initiate construction.
(Added to NAC by Environmental Comm’n, eff. 9-1-89)—(Substituted in revision for NAC 445.24288)