Nevada Administrative Code (Last Updated: January 6, 2015) |
Chapter445A Water Controls |
UNDERGROUND INJECTION CONTROL |
Permits for Underground Injection |
NAC445A.872. Fees.
-
1. A nonrefundable fee must accompany each application for a permit for an injection well. The applicable fee is:
Type of Injection Well
Application Fee
Fee for Annual
Services, Major
Modifications or
Renewal of Permit
Class II, oil and gas...................................
$5,000 plus $625
for each well
$2,500 plus $200
for each well
Class V, geothermal injection wells associated with the production of energy
Producing 25 megawatts or more.........
$6,250 plus $625
for each well
$3,750 plus $200
for each well
Producing 10 megawatts or more but less than 25 megawatts....................
$5,000 plus $625
for each well
$1,875 plus $200
for each well
Producing less than 10 megawatts........
$3,750 plus $625
for each well
$1,250 plus $200
for each well
Class V, geothermal injection associated with space heating
Discharging less than 250,000 gallons daily................................................
$875
$325
Discharging 250,000 gallons or more daily................................................
$1,875
$625
Class V, injection wells associated with remediation, treatment of waste or experimental technology......................
$3,000
$1,500
Class V, injection wells associated with mining pit dewatering...........................
$5,000 plus $625
for each well
$2,500 plus $200
for each well
Class V, injection wells associated with aquifer storage and recovery, aquifer recharge or treated effluent projects.....
$2,000 plus $60
for each well
$600 plus $40
for each well
Class V, all others.....................................
$625 plus $125
for each well
$200 plus $50
for each well
General Permit, remediation lasting more than 6 months......................................
$1,500
$900
General Permit, remediation lasting 6 months or less......................................
$300
General Permit, septic system with a capacity of 5,000 or more gallons........
$400
$300
General Permit, all others with a report requirement..........................................
$400
$300
General Permit, all others without a report requirement..........................................
$200
$150
General Permit, filing fee for review of the plan................................................
$200
2. A Class III well will be charged a fee for a permit for the actual cost of the review of the application calculated at a rate of $50 per hour for the time spent for the review. The fee for renewal of a permit for a Class III well is $750.
3. A fee for the renewal of a permit or for major modifications, if applicable, must be paid in addition to the fee for annual services.
4. The fee for annual services must be:
(a) Submitted to the Division on or before July 1; and
(b) Paid in advance for each subsequent year during the life of the permit.
(Added to NAC by Environmental Comm’n, eff. 7-22-87; A 9-19-90; R042-01, 10-25-2001; R103-04, 2-11-2005)